You probably already know building a custom home takes time. But what most future homeowners don’t realize is just how early that clock starts ticking, or how fast things can go sideways if you’re not prepared.
I can’t tell you how many families I’ve met who thought they had everything lined up, only to have delays hit them square in the chest:
- Permits that take months longer than expected
- Decisions that get stalled without a clear deadline
- Builders who go radio silent just when it matters most
Suddenly, that “next year” move-in date slips. You’re juggling rental renewals, loan extensions, school enrollments, and wondering where it all went off track.
The truth is, most people (and yes, many builders) dramatically underestimate how long it takes to build a truly custom home. And the biggest time-killers? They aren’t on the construction site – they’re buried in the planning.
After more than 30 years building in Flower Mound, Argyle, and Bartonville, I’ve seen these 4 hidden time traps derail timelines and frustrate even the most prepared families.
Here’s how to spot them early, and stay on schedule.
Time Trap #1: Permitting Delays You Can’t Control (But Must Plan For)
Permit timelines are not flexible.
Once your plans are submitted to the city, the clock is out of your hands. Every municipality has its own process, staffing issues, review cycles, and red tape. Some will review your plans in six weeks. Others take three months or more, even if everything is perfect.
And if your home sits on a unique block of land (like a corner parcel, floodplain, or anything outside the norm), expect even more scrutiny and delay.
We’ve had clients delayed for years because of requirements like mandatory street upgrades. One family expected to start building within months, but instead spent three years stuck in a city approvals loop just to address offsite work.
The problem is not factoring this time into the overall timeline.
Here’s how to stay in control:
- Start planning 18 to 24 months before your ideal move-in date. That gives you breathing room for both design and permitting.
- Ask your builder to contact the city before you finalize your design. We always reach out early to clarify what reviews, approvals, and external studies may be required.
- Don’t let optimism set your move-in date. Work backward from a firm deadline (school start, lease ending, baby due) and test whether it’s actually feasible.
Permitting is where the entire build schedule either stays on track or falls apart. Get this part right, and you’re already ahead of 90% of custom builds.
Time Trap #2: Design Delays and Planning Without a Map
One of the most common misconceptions in custom building is that you can “figure things out as you go.”
Selections, revisions, plan approvals – many homeowners think these can happen on the fly, with time to spare. But in reality, the design phase is where most timelines fall apart.
Why? Because without a clear milestone schedule, every decision becomes reactive. Weeks slip by waiting for feedback, trades can’t order materials, permits get delayed because engineering isn’t finished. And before you know it, your move-in date is off by months, while you’re still choosing cabinet colors.
To avoid this trap:
- Start design work early and tie it to a formal schedule. Every deliverable should have a deadline.
- Use a structured process that builds decision-making into the timeline. At Victor Myers, we assign milestone dates for selections, sign-offs, engineering, and permit submissions.
- Make decisions when you have the most control. That’s early, not during construction.
A well-mapped planning phase doesn’t just keep the schedule on track, but protects your energy, your budget, and your confidence.
Time Trap #3: City Setbacks and Surprise City Requirements
Even after your plans are “finished,” your local city might have different ideas.
Every municipality has zoning rules, code requirements, and development quirks that can derail a project if they aren’t accounted for upfront. One of the most common? Setbacks – the required distance between your home and the property line, street, or easement.
Builders who skip this step often get caught mid-permitting, when the city rejects plans because the home encroaches too far forward, too close to a side yard, or over a utility easement.
It gets worse. Some cities require infrastructure upgrades – like fire lanes, sidewalks, or street widening – before construction can begin. One of our recent clients assumed they’d be building in six months. Instead, they spent over two years waiting for a city-mandated street improvement just to start.
To stay in control:
- Get a zoning analysis before design begins. Don’t waste time drawing a home that won’t be approved.
- Ask your builder about your city’s quirks. If they’re not familiar with your municipality’s planning department, that’s a red flag.
- Insist on plan reviews before submission. Catch issues before they go to permitting, not after.
City delays are expensive and draining. But while you can’t remove the red tape, you can avoid being blindsided by it.
Time Trap #4: Builders Who Don’t Communicate When Things Slip
This one rarely shows up on a quote, but it wrecks more timelines than weather delays or supply chain issues ever could.
It happens when a builder doesn’t communicate clearly with you, your trades, or even their own team.
You make a change, but it doesn’t get documented. The error gets discovered weeks later, and now you’re paying for demo, rework, and lost time.
Or worse, no one tells you there’s been a delay at all. You assume progress is being made, only to find out your project has been sitting idle for weeks.
Here’s how to avoid it:
- Ask how communication is structured. Who do you talk to? How often? What systems are in place?
- Require weekly updates with photos and progress benchmarks.
- Tie builder payments to milestones, not calendar dates. That way, you’re never paying for empty promises.
When your builder communicates clearly, you stay informed, empowered, and confident, no matter what comes up.
How to Stay Ahead of Schedule (Before You Ever Break Ground)
Every delayed project I’ve seen had one thing in common: poor planning on the front end. Either the timeline was wishful thinking, the milestones weren’t defined, or the city had surprise requirements no one saw coming. That’s how budgets blow up, families lose momentum, and dream builds become drawn-out battles.
But when you start with clarity, and partner with someone who’s done it right for decades, your project moves forward with confidence.
That’s why I put together a free guide for homeowners who want to stay in control from day one:
The Texas Home Build Playbook: 8 Mistakes That Can Turn Your Dream Home into a Nightmare
- How to avoid the hidden traps buried inside builder contracts
- The design tools that eliminate layout regret
- What great builders do differently
- How to avoid overwhelm and rushed decisions
- Why most delays are preventable
- How to spot poor workmanship early
- How to make informed design choices under pressure
- What it takes to build a home that’s truly comfortable and energy efficient
- Why Choosing the Right Builder Makes All the Difference
And much, much more!
Download your copy today and get ahead of the unknown, before it ever has a chance to slow you down.